28
3
9
12
5
8
6
2
11
4
10
7 12
1
XC-K oil 100
fig. 18
3.14 - ASSEMBLING CASING
Fit the panel board to the upper panel (pos. 9).
Fit the upper panel (pos. 9), complete with panel board,
to the two sides of the casing.
G) Insert into the conduits the bulbs of the instruments as
indicated in fig. 21 and, depending on the panel board
installed on the boiler, the probes as illustrated in the
electric-hydraulic diagrams (page 26).
Wire the panel to the power line, to the burner and to
any pumps, etc.
Close the cover of the electric control board.
Have the plug of the burner and the power cables of
the boiler pass through the side plate (pos. 11) on the
preferred side and secure the cables with the cable
gland supplied.
Fasten the plates (pos. 11) to the sides of the casing.
H) Mount the rear panels (pos. 10 and 11).
I) Fix the boiler data plate to the side panel after having
greased the relevant part with the specific solvent.
The plates are included in the document envelope.
Assembly sequence (Ref. fig. 18, 21)
A) Mount the insulation jackets (pos. 1 and 2) of the boiler
body and secure the 2 edges with the elastic straps
(pos. 3) supplied in the accessory box, hooking them
to the external fabric part of the insulation.
B) Mount the rear insulation (pos. 4).
C) Open the boiler door and mount the front insulation
(pos. 5) fitting the support hinges of the door into the
pre-cuts.
D) Position the side panels (pos. 6 e 7) with the lower bend
inside the L-shaped profile at the base of the boiler body
and hook the upper part in the plate cuts.
To determine which is the right side and which is the
left side, refer to the cable gland plates (pos. 12): they
must face the front of the boiler.
E) Connect the front reinforcement profile (pos. 8) to the
two sides.
F) Rotate the cover of the panel board frontwards after
having removed the two screws on the side and insert
the electric inlet cables and the outlet probe capillaries
through the slots at the base.
Summary of Contents for XC-K oil 230
Page 63: ...63...