19
Tec
hnical f
eatures and dimensions
ENGLISH
3
INSTALLATION INSTRUCTIONS
ATTENTION!
This boiler is intended solely for the use for
which it was expressly designed. Any other
use is to be considered improper and there-
fore dangerous.
This boiler heats water at a temperature
lower than the atmospheric pressure boiling
temperature.
ATTENTION!
The appliances are designed to be installed
inside suitable rooms or technical spaces
only. The appliances cannot be installed or
operate outdoors. Outdoor installation can
cause malfunctioning and be dangerous.
Choose specifically designed appliances for
outdoor installation.
Before connecting the boiler, have profes-
sionally qualified personnel:
a) Thoroughly wash all the piping of the sys-
tem to remove any residues or impurities,
which could jeopardise proper operation
of the boiler.
b) Check that boiler is set up to operate with
the available type of fuel.
This can be seen written on the package
and on the technical feature plate;
c) Check that the chimney/flue has an
appropriate draught, without any bottle-
necks, and that no exhausts from other
appliances are inserted, unless the flue
has been implemented to accommodate
several utilities according to specific
standards and regulations in force. Only
after this check can the fitting between
the boiler and chimney be mounted;
ATTENTION!
If there is dust and/or if there are aggressive/
corrosive vapours present in the installation
room, the appliance must be protected
suitably and must be able to operate
independently from the air in the room.
ATTENTION!
The appliance must be installed by a qualified
technician with the technical-professional
requirements according to law which, under his
own responsibility, guarantees compliance
with standards according to good practice
rules.
ATTENTION!
Mount the appliance respecting the minimum
distances required for installation and main-
tenance.
The boiler must be connected to a central
heating system and/or domestic hot water
supply network compatible with its efficiency
and output.
3.1 - GENERAL WARNINGS
3.2 - STANDARDS fOR INSTALLATION
It must be installed by a professionally qualified technician,
who
shall take the responsibility of observing all local and/or
national laws published in the official journal, as well as
the applicable technical standards.
NOTE!
for further details relating to the stand-
ards, rules and regulations for safe in-
stallation of the thermal unit, refer to the
section "Technical Information" on the
boiler page of the www.unicalag.it website
Summary of Contents for XC-K oil 230
Page 63: ...63...