28
5.2 - ELECTRICAL WIRING DIAGRAM FOR SINGLE PHASE BURNER AND PUMP
fig. 31
Ph Phase (230V ~ 50Hz)
N Neutral
F1 General fuse (max 4A)
Ib1 Burner switch 1
st
boiler
Ib2 Burner switch 2
nd
boiler
IG Illuminated main switch
Ipi C.H. pump switch
Pi C.H. pump
Te1(1) 1
st
stage working thermostat (1
st
boiler)
(30°C÷90°C)
Te1(2) 2
nd
stage working thermostat (1
st
boiler )
(24°C÷84°C)
Te2(1) 1
st
stage working thermostat (2
nd
boiler)
(30°C÷90°C)
Te2(2) 2
nd
stage working thermostat (2
nd
boiler )
(24°C÷84°C)
Tm1 Minimum thermostat 1
st
boiler (30°C)
Tm2 Minimum thermostat 2
nd
boiler (30°C)
Ts1 High limit thermostat 1
st
boiler (100°C)
Ts2 High limit thermostat 2
nd
boiler (100°C)
A1,A2 Additional repetition of lockout for
burners 1 & 2
B1, B2 Additional repetition of working hour
meter for 1
st
stage for burners 1 & 2
C1, C2 Additional repetition of working hour
meter for 2
nd
stage for burners 1 & 2
In case of three phase burner and/or pump, convenient relays have to be foreseen.
The terminals 35 - 36 - 38 - 39 may be used for the connection of additional recirculating pumps.