38
-
When the conversion is complete, fill in the
information required on the label supplied in
the documentation envelope and apply it next
to the technical data label of the boiler.
4.3.1 - Ending of gas transformation
- Close the electric panel and restore the appliance’s
electric power supply;
- Check the pressure value upstream of the gas
valve (see table “NOZZLES - PRESSURE”) and
adjust the CO
2
as indicated in paragraph “3.12”;
- Check that the burner is working properly;
-
Check that there are no gas leaks.
EXAMPLE OF COMPILATION
NOTE!
Further details in the section
‘‘Technical Information’’ on the
boiler page of the www.unicalag.it
website