17
Instructions for the installer
2
1
3
7
5 4
6
fig. 14
Fit the microswitch onto its support and adjust the pushing
washer axially in order to allow the microswitch to be regularly
operated when the upper loading door is closed.
Ascertain that the by-pass disk is perfectly closed when the door
is closed and the boiler in operation.
It is possible to ascertain this by simulating the closing of the
upper door and observing, from the inside of the wood storage
room, if, with a lamp placed in the chimney connection, there
is no visible light.
If necessary, adjust the length of the by-pass rod, acting on the
front threaded shaft.
Otherwise, adjust the length of the by-pass rod by acting on
the threaded bar front
.
- Hook the casing L.H. side panel to the boiler body (pos. 1)
- Hook the casing L.H. side panel to the boiler body (pos. 2)
- Place on the ground the casing upper panel and fit on it the
panel board (pos. 3, 4, 5, e 6).
- Fix to the top panel the rear profile (pos. 7)supporting the
cable clamps .
- Open the panel board by acting with a screwdriver on the
two side screws.
- Rotate forward the panel board cover.
Insert all the capillaries of the thermostats and thermome-
ter (unroll them carefully), the outgoing fan(s) connecting
cable(s), the incoming microswitch cable controlling the
loading door opening and the outgoing electrical supply cable
through the two rectangular holes on the base of the panel
board.
- Place the casing upper panel on the boiler addressing the
ends of the capillaries toward the rear of the boiler.
- Stick the boiler technical data badge to the most accessib-
le side panel after having cleaned and degreased with a
suitable solvent the affected area.
Remove the protecting film from the data badge and apply by
sticking perfectly
Do not remove the label from the boiler because it would
affect the adhesion.
fig. 15