67
UT108/109 OPERATING MANUAL
UT108/109 OPERATING MANUAL
68
6.Fuel System Testing
It is necessary to add more accurate engine fuel control to a low injection automobile.
Since 1980, the automotive manufacturing industry has used electronically-controlled
carburetor and fuel injection so as to achieve lower fuel injection.
(1) GM (General Motor): Testing the dwell of the C-3 mixed-control solenoid: Place the
solenoid in a cylinder, monitoring the ratio between the air and the fuel, which should
generally be 14.7 to 1 between the air and the fuel so as to reduce the injection of
surplus fuel. The testing is used to see if the solenoid is installed right in the position
and the dwell of the meter can also indirectly used for the testing.
[1] Start the engine of the automobile to achieve a rotation speed of 3000 RPM.
So far as a GM automobile is concerned, set the rotary switch to the DWELL and
select 6CYL.
[2] When the automobile is operating in a short fuel state or in a long fuel state, the
dwell of the meter should be displayed between 10° and 50°.
(2) Fuel Injector Resistance Testing (see figure 21)
The testing method is similar to that of the resistance of an ignition coil.
[1] Cut the electric link off the injector. (Refer to the servicing handbooks of various
kinds of automotive manuals for the detailed position.)
[2] Connect the red and black test lead probes to the two ends of the injector. The
Summary of Contents for UT108
Page 1: ...P N 110401102526 ...
Page 2: ...Operating Manual UT108 109 Handheld Automotive Multi Purpose Meters ...
Page 20: ...UT108 109 OPERATING MANUAL 18 Display Symbols see figure 3 Figure 3 ...
Page 24: ...UT108 109 OPERATING MANUAL 22 Figure 4 ...
Page 26: ...UT108 109 OPERATING MANUAL 24 Figure 5 ...
Page 29: ...27 UT108 109 OPERATING MANUAL Figure 6 ...
Page 34: ...UT108 109 OPERATING MANUAL 32 Figure 8 ...
Page 37: ...35 UT108 109 OPERATING MANUAL Figure 9 ...
Page 39: ...37 UT108 109 OPERATING MANUAL Figure 10 ...
Page 41: ...39 UT108 109 OPERATING MANUAL Figure 11 ...
Page 43: ...41 UT108 109 OPERATING MANUAL Figure 12 ...
Page 45: ...43 UT108 109 OPERATING MANUAL Figure 13 ...
Page 61: ...59 UT108 109 OPERATING MANUAL Figure 16 ...
Page 63: ...61 UT108 109 OPERATING MANUAL Figure 17 ...
Page 65: ...63 UT108 109 OPERATING MANUAL Figure 18 ...
Page 68: ...UT108 109 OPERATING MANUAL 66 Figure 20 ...
Page 76: ...UT108 109 OPERATING MANUAL 74 Figure 24 ...
Page 79: ...77 UT108 109 OPERATING MANUAL Figure 26 Figure 25 ...
Page 93: ...91 UT108 109 OPERATING MANUAL Figure 27 ...
Page 95: ......