55
UT108/109 OPERATING MANUAL
UT108/109 OPERATING MANUAL
56
H. Charging System Voltage Testing
This testing is used to see if the charging system operates normally so as to provide the
electronic systems with adequate power (lamps, electric fans, radio sets, etc.).
1. Set the rotary switch to the
DCV
. Insert the red test lead into the
A
terminal and the
black one into the
COM
terminal.
2. Connect the black test lead probe to the negative pole of the battery and the red one to
the positive pole of the battery.
3. Run the engine idle and close or turn off all the accessories with the normal voltage
readings being 13.2 V to 15.2 V.
4. Open the throttle and control the rotation speed of the engine between 1800 RPM
and 2800 RPM. The voltage readings should be consistent with those in (3) (with the
difference being no more than 0.5 V).
5. Turn on the lamps, windshield wipers, fans and so on to increase the loads of the
electronic systems with the voltage readings being no less than 13.0 V.
6. If the readings in Steps 3. 4. and 5. are normal, the charging system is also normal. If
the readings in Steps 3. 4. and 5 are beyond the limits or inconsistent with those in the
operation manual, check the current ranges of the conveying belt, regulator, AC
generator, connector and open-circuit AC generator. If any further diagnosis is required,
refer to various kinds of automotive manuals.
Summary of Contents for UT108
Page 1: ...P N 110401102526 ...
Page 2: ...Operating Manual UT108 109 Handheld Automotive Multi Purpose Meters ...
Page 20: ...UT108 109 OPERATING MANUAL 18 Display Symbols see figure 3 Figure 3 ...
Page 24: ...UT108 109 OPERATING MANUAL 22 Figure 4 ...
Page 26: ...UT108 109 OPERATING MANUAL 24 Figure 5 ...
Page 29: ...27 UT108 109 OPERATING MANUAL Figure 6 ...
Page 34: ...UT108 109 OPERATING MANUAL 32 Figure 8 ...
Page 37: ...35 UT108 109 OPERATING MANUAL Figure 9 ...
Page 39: ...37 UT108 109 OPERATING MANUAL Figure 10 ...
Page 41: ...39 UT108 109 OPERATING MANUAL Figure 11 ...
Page 43: ...41 UT108 109 OPERATING MANUAL Figure 12 ...
Page 45: ...43 UT108 109 OPERATING MANUAL Figure 13 ...
Page 61: ...59 UT108 109 OPERATING MANUAL Figure 16 ...
Page 63: ...61 UT108 109 OPERATING MANUAL Figure 17 ...
Page 65: ...63 UT108 109 OPERATING MANUAL Figure 18 ...
Page 68: ...UT108 109 OPERATING MANUAL 66 Figure 20 ...
Page 76: ...UT108 109 OPERATING MANUAL 74 Figure 24 ...
Page 79: ...77 UT108 109 OPERATING MANUAL Figure 26 Figure 25 ...
Page 93: ...91 UT108 109 OPERATING MANUAL Figure 27 ...
Page 95: ......