Issued/Revised:
22
FOOTING DETAIL - SURFACE MOUNT
2
1
3
4
2
5
1
CM
0
INCH
0
10
9
6
11
14
8
15
7
12
13
4
3
6
5
800.458.5872
www.ultraplay.com
3/31/2020
1. Attach Upright Posts to Footbuck Ass'ys using M10 x 50mm B.H.C.S. and M10 T-Nut. Be sure to use the bottom two holes in
Footbuck Ass'y. See Detail 009. Peen T-Nut using a hammer to conform around Upright Post.
2. Attach Platform Mounting Bracket to Footer Plate using M10 x 35mm B.H.C.S. and M10 Lock Nut. See Detail 012.
3. Attach Slide Mounting Bracket to Slide Surface Mount Bracket using M10 x 35mm B.H.C.S. and M10 Lock Nut. See Detail 015.
4. Continue assembling the unit. Refer to pages 26 to 44.
5. After unit is assembled using Footbuck Ass'ys and Footer Plates as template, mark hole position on concrete. Remove Footbuck
Ass'y and Footer Plates and drill 3/8" Dia. x 2" deep holes into concrete to receive anchor.
6. Attach Footbuck Ass'ys and Footer Plates to concrete using Concrete Anchor, M10 Flat Washer, and M10 Lock Nut. See Detail 011.
012
PLATFORM MOUNTING
BRACKET
FOOTER
PLATE
M10 x 35mm (1 3/8")
BHCS BOLT
(33-11-0005)
M10 LOCK NUT
(33-11-0400)
011
M10 LOCK NUT
(33-11-0400)
M10 FLATWASHER
(33-11-0200)
FOOTBUCK
ASS'Y
CONCRETE
ANCHOR
(33-11-0702)
015
M10 x 35mm (1 3/8")
BHCS BOLT
(33-11-0005)
M10 LOCK NUT
(33-11-0400)
SLIDE SURFACE
MOUNT BRACKET
SLIDE MOUNTING
BRACKET
009
Peen T-Nut using a hammer
after tightened to conform
around Upright Post.
M10 T-NUT
(33-11-0402)
FOOTBUCK
ASS'Y
UPRIGHT
POST
M10 x 50mm (2")
BHCS BOLT
(33-11-0010)
Summary of Contents for DC-SPRING DC-017
Page 1: ...Issued Revised DC SPRING 800 458 5872 www ultraplay com 1 3 31 2020 MODEL DC 017...
Page 2: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 15: ...Issued Revised TOOLS REQUIRED 800 458 5872 www ultraplay com 14 3 31 2020...