1. Attach Upright Posts to Footbuck Ass'ys using M10 x 50mm B.H.C.S. and M10 T-Nut. Making sure to use the top two holes in
Footbuck Ass'y. See Detail 009. Peen T-Nut using a hammer to conform around Upright Post.
2. Attach Platform Mounting Bracket to Platform Onground Bracket using M10 x 35mm B.H.C.S. and M10 Lock Nut. See Detail 010.
3. Attach Slide Mounting Bracket to Slide Onground Bracket using M10 x 35mm and M10 Lock Nut . See Detail 016.
4. Continue to assembling unit. Refer to 26 to 44.
5. With Footbuck Ass'ys and Platform Onground Bracket in position, secure each Footbuck Ass'y and Platform Onground Bracket to
the ground using Ground Spikes. NOTE: A 4lb. hammer may be required to drive spikes into the ground. Install ground spikes
angled inward as shown in illustration. See Detail 008.
IMPORTANT:
Refer to Post Placement/Hole Locations diagram to mark
locations of Footbuck Ass'ys and Platform Onground Bracket.
009
M10 T-NUT
(33-11-0402)
Peen T-Nut using a hammer
after tightened to conform
around Upright Post.
M10 x 50mm (2")
BHCS BOLT
(33-11-0010)
UPRIGHT
POST
FOOTBUCK
ASS'Y
010
M10 LOCK NUT
(33-11-0400)
M10 x 35mm (1 3/8")
BHCS BOLT
(33-11-0005)
PLATFORM ONGROUND
BRACKET
PLATFORM MOUNTING
BRACKET
016
M10 x 35mm (1 3/8")
BHCS BOLT
(33-11-0005)
M10 LOCK NUT
(33-11-0400)
SLIDE MOUNTING
BRACKET
SLIDE ONGROUND
BRACKET
008
FOOTBUCK
ASS'Y
GROUND SPIKE
(02-07-0048)
Summary of Contents for DC-SPRING DC-017
Page 1: ...Issued Revised DC SPRING 800 458 5872 www ultraplay com 1 3 31 2020 MODEL DC 017...
Page 2: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 15: ...Issued Revised TOOLS REQUIRED 800 458 5872 www ultraplay com 14 3 31 2020...