
UPT Series Easy Melt
Operation Manual
Version 1.2 5
www.ultraflexpower.com
1.1.2.3
SAFETY AND PRECAUTION SYMBOLS USED IN THIS MANUAL
A
WARNING
symbol alerts you to a hazard that may result in equipment damage, personal injury, or
death. Carefully read the instructions provided WARNING and follow all safety precautions.
A
CAUTION
symbol alerts you that the system may not operate as expected if instructions are not
followed.
1.1.2.4
MAGNETIC FIELD
WARNING: MAGNETIC FIELD!
CAN BE HARMFUL TO PACEMAKER WEARERS AND PEOPLE WITH METALLIC IMPLANTS!
PACEMAKER AND METALLIC IMPLANTS WEARERS STAY BACK 30sm (12in)!
1.2
INSTALLATION AND START UP
1.2.1
INSTALLATION PROCEDURE
The installation procedure consists of the following steps:
•
Unpacking the equipment;
•
Selecting the site where the equipment will be used;
•
Connecting the Heat Station (if remote Heat Station is provided);
•
Connecting accessories or interfacing the system with other controls (if necessary);
•
Completing the Power and Ground/Earth connections.
POWER AND GROUND/EARTH CONNECTIONS MUST BE MADE LAST. FAILURE TO DO SO WILL
CREATE A HAZARDOUS CONDITION THAT MAY RESULT IN EQUIPMENT DAMAGE, PERSONAL
INJURY, OR DEATH.
NOTE:
Ultraflex has a staff of field engineers who are available to supervise the installation of the equipment. If
installation service is required, contact our Technical Service Department for additional information.
Provisions for facility electrical power service are customer furnished. Requesting field engineering assistance before
customer furnished provisions are installed at the equipment site could delay equipment installation and cause
unnecessary expense.