
12
Installing the Base Station
6. Identify the
PINK
wire labeled
C2/C8
from
the “Clock Bundle” and attached that wire in
the irrigation clock’s Valve Station #2 terminal
where you removed the wire in step 5 above.
7. Repeat steps 3 thru 6 above for all valve
station wires using the labels on the wires
to identify the proper station and valve wires
(Refer to Wire Reference Guide on page 8).
8. Next hook up the Pump Relay and/or Master
Valve by connecting the wires from the Base
Stations and Irrigation Clock in series.
9. Identify the
GRAY
wire labeled
PM (V),
from
the “Valve Bundle” coming from Base Station
#1 and butt connect it to the
BROWN
wire
labeled
PM (C)
, from the “Clock Bundle” from
Base Station #2 and crimp it so it is attached
securely.
WIRING 2 BASE STATIONS WITH A PUMP/MASTER VALVE TO CONTROL UP TO 12 STATIONS
(CONTINUED)