14
15
A
G
P
D
P
G
H
7A
7C
3.2mm
Note: The panels (G
&
P) may be adjusted by inserting them to the required depth in their
corresponding rails.
A. Verify the level and that the door (H) opens and closes properly. Adjust panels if
required (
&
) by increasing or reducing the gap A.
7B. According yo the drawing,drill three
3.2
holes.
7C. Assemble the panels ( & ) with the tracks by placing the screws (1), then
install
the
decorative screw caps (5) as shown in the illustration.
7
G P
mm
G P
3-
3.2
10mm
1
0
m
0
m
m
10
0m
Glass
Middle
Inside
Outside
7B
Installing
the
track
screws
J
H
H
I
8A
8B
8C
8A. Prepare the assembly of the two handles(I
&
J) .
8B. Install the handle (J) as shown and make sure the horizontal handle (J) is inside the
shower.
Hold the handle(J)and make sure the screw of handle(J) is fixed against the inner
side of the installation hole,then turn around the handle(I).
Note: The washers and the PVC glass protection gasket have to be mounted on each side on
the door to protect the glass.
8C. Install the handle (I) by hand
and make sure to place the PVC glass protection gasket
Installing
the
door
handle
16
17
9A
9B
9C
NOTE: Before installing glass support clips (L),check that doors close and open easily.Minor
adjustments can be required to have a smooth running.
9A. Place rear bracket (L) and one rubber gasket centered in the notch as illustrated and
mark location of hole to drill on shower base.
9B. Remove glass support bracket and rubber gasket.
Drill a hole in the shower base using the drill bit size
φ
.
9C. Add a drop of silicone to the drilled hole; put back the rear bracket and the rubber seal
and tighten using the screw (2), then, place the front bracket and the rubber seal and tighten
using the Allen key (8).
9D. Repeat the same operations to install the second bracket on the other side.
3.2mm(1/8")
Add
a
drop
of
silicone
to
the
drilled
hole
before
installing
screw
and
bracket
#
4
Installing
glass
support
brackets
N
N
10A
10B
10A
10B
N
N
10A. Install the aluminium
(N) and plastic connectors(S1&R1), by placing the open mouth of
the plastic parts into the panel(G&P) . Then drilling the 3.2 hole aimed at the elliptical hole of
plastic parts by Drill.
10B. Tighten the screws(1) on the plastic parts(S1 & R1) with a screwdriver,and then install
decorative caps.
NOTE:The plastic parts(S2 & R2) are for the installation of shower in a left-to-right direction.
Installing
connectors
aluminum
R1
S1
R1
S1
S2
R2
H
H
J
I
3.2mm
3.2mm
J
mm
ou
t
20
mm
Ab
Summary of Contents for 98495003
Page 1: ...7...