UAV-1004234-001, AV-30-E, Installation Manual
23
Rev C
10 Equipment Installation
10.1 Overview
Installation consists of the following steps:
•
Remove / relocate any legacy instrumentation
•
Add or locate an appropriate power source / breaker
•
Wire power and system interfaces as needed
•
Mount the unit to the instrument panel with supplied screws
•
Apply power and perform setup
•
Connect pitot and static to both AI and DG. Perform leak check after
installation.
10.2 Supplied Components
Table 4 - Supplied Components
Component
Part Number
Description
AV-30-E Unit
UAV-1004035-001
AV-30-E Unit
UAV-1004035-002
AV-30-E Unit with
Internal
Magnetometer
AV-30-E Installation Kit
UAV-1004091-001
Installation Kit
10.3 Non-Supplied Components
Table 5 - Non-Supplied Components
Component
Description
Pitot / Static Tubing
Length as required
Pitot Static T’s
Quantity as required
Circuit Breakers (2A)
One required for each instrument
OAT Probe
Davtron P/N C307PS
Power and Interconnect
Wire
See AC 43.13-1B Chapter 11, Section 7 for
acceptable wire types