50
Figure 32: Cad Cell Location
Ix. SYSTEM START-UP (continued)
•
If safety switch shuts down burner and
resistance is above 1600 OHMS, open line
switch to boiler. Access cad cell under
ignitor, clean face of cad cell and see that
cell is securely in socket, see Figure 32. Check
gasket around perimeter of ignitor lid for proper
seal. If gasket is missing or damaged,
replace gasket. Room light can effect cad
cell resistance. Reset safety switch.
•
Close line switch to boiler. If burner starts
and runs beyond safety switch cut-off
time, cell is good. If not, install new cell.
•
Close hand valve in oil supply line.
•
Failure occurs, device enters Recycle Mode.
•
Device tries to restart system after
approximately 60 seconds.
•
After third Recycle Mode trial, safety switch
locks out within safety switch timing indicated
on label and control enters Restricted Mode.
Ignition and motor stop and oil valves closes.
d. Power Failure Check: After Flame is established,
turn the power off to the control/burner. The burner
should shut down safely. When power is restored a
normal ignition sequence should be started.
WARNING
Cad Cell Jumper must be removed after this check.
K. CHECK HIGH LIMIT
1. Adjust system thermostat(s) to highest setting.
2. Allow burner to run until boiler water temperature
exceeds high limit setting. The burner should shut
down and circulators continue running.
3. Allow the temperature to drop below control setting.
The burner must restart.
4. Boiler installation is not considered complete until this
check has been made.
L. IF CONTROLS MEET REQUIREMENT
outlined in
Paragraphs I thru k.
1. Allow boiler to operate for approximately 30 minute,
confirm the boiler and system have no leaks.
2. Reset thermostat(s) at desired setting.
M.
IF CONTROLS DO NOT MEET
REQUIREMENTS
outlined in Paragraphs I thru k,
replace control and repeat checkout procedures.
Summary of Contents for MPO - IQ
Page 6: ...6 Figure 1 MPO IQ84 Thru MPO IQ231 Water Boiler ...
Page 22: ...22 Figure 11 Boiler Removal from Skid III UNIT PAK BOILER ASSEMBLY TRIM CONTROLS continued ...
Page 42: ...42 Figure 28A Schematic Wiring Diagram VII ELECTRICAL continued ...
Page 43: ...43 Figure 28B Schematic Wiring Diagram Burner Options VII ELECTRICAL continued ...
Page 44: ...44 Figure 28C Ladder Diagram VII ELECTRICAL continued ...
Page 70: ...70 Bare Boiler Assembly XIV Repair Parts continued ...
Page 72: ...72 Jacket Assembly XIV Repair Parts continued ...
Page 74: ...74 MPO IQ84 Thru MPO IQ231 Water Boilers Trim and Controls XIV Repair Parts continued ...
Page 78: ...78 Beckett AFG Burner XIV Repair Parts continued ...
Page 80: ...80 Beckett NX Burner XIV Repair Parts continued ...
Page 92: ...92 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...