33
E. MINIMUM CLEARANCES
See Figure 2A for details regarding clearances to combustibles
for the boiler.
F. OPTIONAL AIR INTAKE PIPING INSTALLATION
-
All air for combustion can be supplied directly to the burner
from outdoors providing that the criteria for chimney, vent
connector and minimum stack temperature outlined in this
section can be maintained.
(ONLY AVAILABLE WITH
BECKETT BURNER).
Refer to Section I, Paragraph
C, Steps 5 and 6 for optional air intake piping installation
information.
WARNING
Using outdoor air in the middle of winter may
result in lower stack temperatures and chimney
degradation. Any signs of condensate seepage
or discoloration at the base of chimney must be
remedied immediately per the details outlined in
this section.
Do not reduce size of air intake pipe.
Read, understand and follow combustion air
instruction restrictions contained in the Pre-
Installation Section of this manual.
V. NATURAL DRAFT VENTING (continued)
Summary of Contents for MPO - IQ
Page 6: ...6 Figure 1 MPO IQ84 Thru MPO IQ231 Water Boiler ...
Page 22: ...22 Figure 11 Boiler Removal from Skid III UNIT PAK BOILER ASSEMBLY TRIM CONTROLS continued ...
Page 42: ...42 Figure 28A Schematic Wiring Diagram VII ELECTRICAL continued ...
Page 43: ...43 Figure 28B Schematic Wiring Diagram Burner Options VII ELECTRICAL continued ...
Page 44: ...44 Figure 28C Ladder Diagram VII ELECTRICAL continued ...
Page 70: ...70 Bare Boiler Assembly XIV Repair Parts continued ...
Page 72: ...72 Jacket Assembly XIV Repair Parts continued ...
Page 74: ...74 MPO IQ84 Thru MPO IQ231 Water Boilers Trim and Controls XIV Repair Parts continued ...
Page 78: ...78 Beckett AFG Burner XIV Repair Parts continued ...
Page 80: ...80 Beckett NX Burner XIV Repair Parts continued ...
Page 92: ...92 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...