3. Status Screens (continued)
XII. Operation
E. Boiler Sequence Of Operation (continued)
Bargraph Screen
The bargraph screen presents measured values for easy comparison.
Pumping is a major part of any hydronic system. This screen provides the
status of the boiler’s demand to connected pumps as well as the status of Frost
Protection and pump Exercise functions.
This screen provides the status of the boilers five (5) possible heat demands.
When demand is off the Control has not detected the call-for-heat. This screen
allows the user to determine which demands are present when more than one
demand is present.
Cycles and Hours
Boiler cycles and hours are used
to monitor the boilers overall
compatibility to the heating load.
Excessive cycling compared to run
time may be an indication of pumping,
boiler sizing or adjustment issues.