XI. Start-Up and Checkout
(continued)
11. Start the boiler using the operating instructions on page 100. With the boiler powered up, and with no call for heat, the
display should look like Figure 11.1a. Once a call for heat is present, it will look like Figure 11.1b.
12. The boiler should attempt to fire approximately 30 seconds after a call for heat appears. With the front door removed
from the boiler, this try for ignition will appear as an audible spark (lasting approximately 4 seconds) and an audible
click from the gas valve. Upon initial start-up, the gas train will be filled with air. Even if the gas line has been
completely purged of air, it may take several tries for ignition before a flame is established. If the boiler does not light
after six tries for ignition, it will enter a “soft lockout” and will wait for one hour before attempting another ignition
sequence. This soft lockout can be reset by interrupting power to the boiler for a few seconds. Once a flame has been
established for the first time, subsequent calls for burner operation should result in a flame on the first try.
13. If there is a problem that appears before the first try for ignition, or if the boiler fails to light after four tries for ignition,
the “HELP” will blink on the Home screen (Figure 11.1c). Touching this “HELP” button will take the user to the
Diagnostics menu where the cause of the problem can usually be found by pressing the flashing button on each
successive screen. For more information, see Section XII “Operation”.
14. Inspect the flame which is visible through the window. On high fire the flame should be stable and mostly blue (Figure
11.2). No yellow tipping should be present; however, intermittent flecks of yellow and orange in the flame are normal.
15. Check the inlet gas pressure. Verify that the inlet gas pressure is between the upper and lower limits shown on the rating
plate with all gas appliances on and off.
Figure 11.1a: Home Screen at Power-Up (No Call for Heat)
Figure 11.1b: Home Screen on Heat Demand
Figure 11.1c: Home Screen with Active Fault
Summary of Contents for ASPEN ASPN-320
Page 88: ...88 107750 01 9 17 Figure 10 4 Proper Installation of Header Sensor X Wiring continued ...
Page 89: ...89 107750 01 9 17 Figure 10 5 Internal Wiring Ladder Diagram X Wiring continued ...
Page 90: ...90 107750 01 9 17 X Wiring continued CONDENSATE FLOAT SWITCH ...
Page 91: ...91 107750 01 9 17 X Wiring continued Figure 10 6 Internal Wiring Connections Diagram ...
Page 100: ...100 107750 01 9 17 Operating Instructions XI Start Up and Checkout continued ...
Page 145: ...145 107750 01 9 17 XV Service Parts continued ...
Page 147: ...147 107750 01 9 17 XV Service Parts continued All Models ...
Page 149: ...149 107750 01 9 17 XV Service Parts continued All Models ...
Page 151: ...151 107750 01 9 17 XV Service Parts continued All models ...
Page 157: ...157 107750 01 9 17 ...
Page 158: ...158 107750 01 9 17 ...
Page 159: ...159 107750 01 9 17 ...