108
107750-01 - 9/17
3. Status Screens
Boiler Status screens are the primary boiler monitoring screens. The user may simply “walk” though boiler operation
by repeatedly selecting the right or left “arrow” symbol. These screens are accessed by selected the “Status” button
from the “Home” screen.
XII. Operation
E. Boiler Sequence Of Operation (continued)
Figure 12.6: Status Screens
Figure 12.7: Boiler Status Screen Definitions
NOTE
Only visible if Zone Panel is
connected. Zone Panel 1 and 2
shown typical for 1 through 4.
Summary of Contents for ASPEN ASPN-320
Page 88: ...88 107750 01 9 17 Figure 10 4 Proper Installation of Header Sensor X Wiring continued ...
Page 89: ...89 107750 01 9 17 Figure 10 5 Internal Wiring Ladder Diagram X Wiring continued ...
Page 90: ...90 107750 01 9 17 X Wiring continued CONDENSATE FLOAT SWITCH ...
Page 91: ...91 107750 01 9 17 X Wiring continued Figure 10 6 Internal Wiring Connections Diagram ...
Page 100: ...100 107750 01 9 17 Operating Instructions XI Start Up and Checkout continued ...
Page 145: ...145 107750 01 9 17 XV Service Parts continued ...
Page 147: ...147 107750 01 9 17 XV Service Parts continued All Models ...
Page 149: ...149 107750 01 9 17 XV Service Parts continued All Models ...
Page 151: ...151 107750 01 9 17 XV Service Parts continued All models ...
Page 157: ...157 107750 01 9 17 ...
Page 158: ...158 107750 01 9 17 ...
Page 159: ...159 107750 01 9 17 ...