29
107750-01 - 9/17
Option
10
11
12
13
14
15
16
17
Illustrated in Figure
7.15, 717 7.15, 7.17 7.17, 7.18 7.17, 7.18
7.17
7.17
7.17
7.17
Pipe
Penetration
through
Structure
Vent
Roof
Roof
Roof
Roof
Roof
Roof
Roof
Roof
Intake
Roof
Roof
Roof
Roof
Roof
Roof
Roof
Roof
Material
Vent
CPVC/
PVC
(Note 2)
CPVC/
PVC
(Note 2)
DuraVent
PolyPro
(Rigid)
DuraVent
PolyPro
(Rigid)
Selkirk
Polyflue
Selkirk
Polyflue
Centro-
therm
InnoFlue
SW
Centro-
therm
InnoFlue
SW
Intake
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
Nominal
Diameter
Vent
3"
4"
3"
4"
3"
4"
3"
4"
Intake
3"
4"
3"
4"
3"
4"
3"
4"
Min Equivalent Vent Length:
Model Sizes
320
30"
30"
30"
30"
30"
30"
30"
30"
399
30"
30"
30"
30"
30"
30"
30"
30"
Max Equivalent Vent Length (Note 1):
Model Sizes
320
60ft
135ft
60ft
135ft
60ft
135ft
60ft
135ft
399
50ft
135ft
50ft
135ft
50ft
135ft
50ft
135ft
Terminal Option H
(Fittings)
Vent
Coupling
w/Screen
Coupling
w/Screen
3PPS-12B
or
3PPS-36B
w/Screen
4PPS-12B
or
4PPS-36B
w/Screen
3PF-10UV
or
3PF-39UV
w/Screen
4PF-10UV
or
4PF-39UV
w/Screen
ISEP03 or
ISEP0339
w/Screen
ISEP04 or
ISEP0439
w/Screen
Intake 180 Elbow
w/Screen
180 Elbow
w/Screen
180 Elbow
w/Screen
180 Elbow
w/Screen
180 Elbow
w/Screen
180 Elbow
w/Screen
180 Elbow
w/Screen
180 Elbow
w/Screen
Terminal Option I
(Ipex FGV Concentric)
Ipex
196006
(Note 3)
Ipex
196021
(Note 3)
Not
Permitted
Not
Permitted
Not
Permitted
Not
Permitted
Not
Permitted
Not
Permitted
Terminal Option J
(Diversitech CVENT
Concentric)
CVENT-3 CVENT-4
Not
Permitted
Not
Permitted
Not
Permitted
Not
Permitted
Not
Permitted
Not
Permitted
Terminal Option K
(DuraVent Vertical
Concentric)
Not
Permitted
Not
Permitted
3PPS-VK
4PPS-VK
Not
Permitted
Not
Permitted
Not
Permitted
Not
Permitted
Notes:
1. Max vent lengths shown also apply to the intake. For example, Vent Option #1 may have up to 60ft of vent pipe and also up to 60 ft of
intake pipe.
2. At least 30" of CPVC pipe, and at least one CPVC elbow, must be installed between the boiler's vent connection and PVC pipe.
Downstream vent pipe can be PVC except as noted in text.
3. Ipex FGV Concentric Terminal available in various lengths and also CPVC (see text).
All vertical terminals require compatible roof flashing and storm collars.
VII. Venting
C. Design Requirements Unique to Vertical Venting Systems (continued)
Table 7.13a: Summary of Vertical Twin Pipe Venting Options
Summary of Contents for ASPEN ASPN-320
Page 88: ...88 107750 01 9 17 Figure 10 4 Proper Installation of Header Sensor X Wiring continued ...
Page 89: ...89 107750 01 9 17 Figure 10 5 Internal Wiring Ladder Diagram X Wiring continued ...
Page 90: ...90 107750 01 9 17 X Wiring continued CONDENSATE FLOAT SWITCH ...
Page 91: ...91 107750 01 9 17 X Wiring continued Figure 10 6 Internal Wiring Connections Diagram ...
Page 100: ...100 107750 01 9 17 Operating Instructions XI Start Up and Checkout continued ...
Page 145: ...145 107750 01 9 17 XV Service Parts continued ...
Page 147: ...147 107750 01 9 17 XV Service Parts continued All Models ...
Page 149: ...149 107750 01 9 17 XV Service Parts continued All Models ...
Page 151: ...151 107750 01 9 17 XV Service Parts continued All models ...
Page 157: ...157 107750 01 9 17 ...
Page 158: ...158 107750 01 9 17 ...
Page 159: ...159 107750 01 9 17 ...