Position the floor panel in such a way that the ceramic tiles/ IR floor heating point towards the front
of the sauna.
Note: Put the ceiling, bench valance and bench aside until the corresponding steps.
Rear wall panel (
Box
2):
•
Place the rear wall panel part into the rear slot on the floor panel.
•
Attach the second back panel section to the first back panel section (see picture below).
•
The back panel part must be held upright until the right panel is fitted.
•
Connect the electricity supply to the B-1 junction box.
•
Fix the cover of the B-1 junction box with 2 Phillips screws.
Note – Put the front panel aside until the “Front panel” section.
Page 4
Summary of Contents for Prime+ 1811
Page 9: ...Door handles Inside Outside Your infrared sauna is now ready for use Page 9 ...
Page 12: ...Wiring Diagram Page 12 ...
Page 21: ...Dörrhandtag Insida Utsida Nu är infravärmekabinen klar att använda Sidan 9 ...
Page 24: ...Kopplingsschema Sidan 12 ...
Page 36: ...Schéma électrique Page 12 ...
Page 45: ...Türgriffe Innenseite Außenseite Ihre Infrarot Wärmekabine ist jetzt einsatzbereit Seite 9 ...
Page 48: ...Wiring Diagram Seite 12 ...