How to construct the sauna:
Note – there are 11 power connections in all and several low voltage connections.
(7) are in the cabin: (back, left and right) wall panels, bench valance, bench valance fan,
bench and main power connection.
There are additional power connections on the top outer face of the ceiling.
(1) Mains connection cable for the cabin. Do NOT insert the main electrical connection
cable for the sauna into the socket before all the assembly steps have been
completed correctly.
------------------------------------------------------------------------------------------------------------------------------------------------
There are (5) power connection/ junction boxes that are labelled accordingly and must be connected after
assembling each section.
Back panel
Left
Right
Bench valance
Bench
B1 to B1
L1 to L1
R1 to R1
S3 to S3
S1 to S1
B2 to B2
These (5) power plugs are connected easily by simply inserting the white plug of the white junction
box cover into the correct plug-in connection (3) in the junction box.
Example below: L1 to L1 (left wall panel power connection) (left wall panel junction box)
Fitting the junction box covers
: After the junction box has been connected securely fix the junction
box cover with a Phillips screwdriver and 2 Phillips screws from Box 1.
Floor panel (
Box
1):
Put the floor panel on a level surface 8-16 cm from the wall panel and no more
than 152 cm away from a 230V socket.
Page 3
Summary of Contents for Prime+ 1811
Page 9: ...Door handles Inside Outside Your infrared sauna is now ready for use Page 9 ...
Page 12: ...Wiring Diagram Page 12 ...
Page 21: ...Dörrhandtag Insida Utsida Nu är infravärmekabinen klar att använda Sidan 9 ...
Page 24: ...Kopplingsschema Sidan 12 ...
Page 36: ...Schéma électrique Page 12 ...
Page 45: ...Türgriffe Innenseite Außenseite Ihre Infrarot Wärmekabine ist jetzt einsatzbereit Seite 9 ...
Page 48: ...Wiring Diagram Seite 12 ...