Chapter 2: Setting Up
33
Note:
The FDD rails each have a flat side which should be
against the body of the floppy drive when installed. There is
also a spring catch mechanism on the right hand rail (when
looking at the floppy disk drive from the front).
3. Plug the floppy disk drive cable into the port on the back
of the floppy disk drive. Thread the cable out through the
back of the empty drive bay.
4. Slide the floppy disk drive into the drive bay until it clicks
into place and fits flush with the front panel.
5. Plug the other end of the supplied floppy disk drive cable
into the floppy disk drive controller on the motherboard.
Summary of Contents for Tank TA26 B5380
Page 1: ...Tank TA26 B5380 Service Engineer s Manual...
Page 2: ......
Page 15: ...Chapter 1 Overview 7 Screw Pack Sliding Rail Brackets FDD Power Cable TYAN Logo...
Page 18: ...10 Chapter 1 Overview 1 5 4 Motherboard Layout...
Page 20: ...12 Chapter 1 Overview 1 5 6 System Block Diagram...
Page 22: ...14 Chapter 1 Overview...
Page 39: ...Chapter 2 Setting Up 31 7 Reinsert the tray into the bay and press the locking lever to secure...