![TYAN Tank TA26 B5380 Service Manual Download Page 25](http://html1.mh-extra.com/html/tyan/tank-ta26-b5380/tank-ta26-b5380_service-manual_1185582025.webp)
Chapter 2: Setting Up
17
2.1
Rack Mounting
After installing the necessary components, the Tank TA26-
B5380 can be mounted in a rack using the supplied rack
mounting kit.
Rack mounting kit
Sliding Rails x 2:
Mounting Ears x 2
Screws Kit x 1
Mounting Brackets x 4 (pre-installed)
2.1.1 Installing the Server in a Rack
Follow these instructions to mount the TA26-B5380 into an
industry standard 19" rack.
NOTE
: Before mounting the Tank TA26-B5380 in a rack,
ensure that all internal components have been installed and
that the unit has been fully tested. Maintenance can be per-
formed on the unit while in a rack but it is preferable to install
the device in a fully operational condition.
Screws List
A: M4L6, S10c screw x4
B: M6 screw x8
C: M4-L5 screw x18
A B C
Summary of Contents for Tank TA26 B5380
Page 1: ...Tank TA26 B5380 Service Engineer s Manual...
Page 2: ......
Page 15: ...Chapter 1 Overview 7 Screw Pack Sliding Rail Brackets FDD Power Cable TYAN Logo...
Page 18: ...10 Chapter 1 Overview 1 5 4 Motherboard Layout...
Page 20: ...12 Chapter 1 Overview 1 5 6 System Block Diagram...
Page 22: ...14 Chapter 1 Overview...
Page 39: ...Chapter 2 Setting Up 31 7 Reinsert the tray into the bay and press the locking lever to secure...