![TYAN Tank GT14 B5180 Service Manual Download Page 56](http://html1.mh-extra.com/html/tyan/tank-gt14-b5180/tank-gt14-b5180_service-manual_1185576056.webp)
2.
2
.2
Installing the Server in an Open Rack (with Rail kit B)
In addition to rackmounting the GT14 in a 4-post rack, you
can also mount it in a 2-post rack. You
must
use rail kit B to
mount the GT14 in this type of rack.
NOTE
: Before mounting the Transport GT14 in a rack, ensure
that all internal components have been installed and that the
unit has been fully tested. Maintenance can be performed on
the unit while in a rack but it is preferable to install the device
in a fully operational condition.
1. Install the inner rail brackets to left and right sides of
chassis using 3 M4-4L(E) screws for each side.
2-post open rack
48
Chapter 2: Setting Up
Summary of Contents for Tank GT14 B5180
Page 1: ...Tank GT14 B5180 Service Engineer s Manual...
Page 2: ......
Page 31: ...1 5 7 System Block Diagram Chapter 1 Overview 23...
Page 34: ...26 Chapter 1 Overview...
Page 82: ...74 Chapter 3 Replacing Pre Installed Components...