
3. Push the chassis in and pull the latch key (A). Then push the whole
system into the rack (B).
A
B
4. Secure the mounting
ears of chassis to the
rack with 2 M6 x 13 (B)
screws.
Note:
To avoid injury, it is strongly recommended that two people
lift the TN68-B4989 into the place while a third person
screws it to the rack.
Chapter 2: Setting Up
41
Summary of Contents for B4989
Page 1: ...Transport TN68 B4989 Service Engineer s Manual...
Page 2: ......
Page 27: ...1 6 6 System Block Diagram Chapter 1 Overview 19...
Page 30: ...22 Chapter 1 Overview...
Page 41: ...Chapter 2 Setting Up 33...
Page 43: ...5 Secure the holder to the chassis follow the above steps in reverse Chapter 2 Setting Up 35...
Page 50: ...42 Chapter 2 Setting Up...
Page 54: ...46 Chapter 3 Replacing Preinstalled Components...
Page 72: ...Rear View 64 Chapter 3 Replacing Preinstalled Components...
Page 86: ...Step 6 Connect the data cables 78 Appendix II Installing the Internal 2 5 HDD...
Page 92: ...84 Appendix IV Cable Connection Tables...
Page 96: ...88 Appendix V FRU Parts Table...