
B
Note:
The system supports up to four CPUs, CPU0 must be
installed first follow by CPU1, CPU2 and CPU3. For CPU
sequence please refer to Chapter 1.5.3.
5. Take off the CPU
protection cap;
6. Lift up the CPU lever to
unlock the socket, Open
the socket cover as the
arrow shows;
28
Chapter 2: Setting Up
Summary of Contents for B4989
Page 1: ...Transport TN68 B4989 Service Engineer s Manual...
Page 2: ......
Page 27: ...1 6 6 System Block Diagram Chapter 1 Overview 19...
Page 30: ...22 Chapter 1 Overview...
Page 41: ...Chapter 2 Setting Up 33...
Page 43: ...5 Secure the holder to the chassis follow the above steps in reverse Chapter 2 Setting Up 35...
Page 50: ...42 Chapter 2 Setting Up...
Page 54: ...46 Chapter 3 Replacing Preinstalled Components...
Page 72: ...Rear View 64 Chapter 3 Replacing Preinstalled Components...
Page 86: ...Step 6 Connect the data cables 78 Appendix II Installing the Internal 2 5 HDD...
Page 92: ...84 Appendix IV Cable Connection Tables...
Page 96: ...88 Appendix V FRU Parts Table...