![Twilight DT4200 Instruction Manual Download Page 31](http://html.mh-extra.com/html/twilight/dt4200/dt4200_instruction-manual_1183918031.webp)
25
Using Test Leads
DT4911 Test Lead
Sleeves
Metal pins
Barriers
Plugs
Cables
Metal pin
Connect to the object to be measured.
Approx. 3 mm (sleeve attached)
Approx. 15 mm (sleeve removed)
Sleeve
Attach to the metal pins to prevent short circuit accidents.
Barrier
Represents the safe handling distance from the metal pins.
During measurement, do not touch the area
between the barrier and the tip of the sleeve.
Plug
Connect to the measurement terminals on this instrument.
Cable
Double sheathed cables (Length: approx. 540 mm)
When the white portion inside the cable is exposed,
replace with a new DT4911 Test Lead.
Removing and attaching the sleeves
Removing the sleeves
Attaching the sleeves
Gently hold the bottom of the
sleeves and pull the sleeves off.
Safely store the removed sleeves
so as not to lose them.
Insert the metal pins of the test
leads into the holes of the sleeves,
and
fi
rmly push them all the way in.
Summary of Contents for DT4200
Page 2: ......
Page 6: ...iv Contents ...
Page 60: ...54 Power on Option Table ...
Page 76: ...Appx 2 RMS and Average ...
Page 77: ...16 01 EN ...
Page 78: ......
Page 79: ......