SET-UP AND SAFE OPERATING PROCEDURES
3-7
89210007
SECTION 3:
INSTALLATION AND OPERATION
3.01 CONNECTING THE SPOOL GUN
1. Make sure the welding
power source is turned
OFF
before connecting
the welding gun.
2. Insert the gun connection
into the feeder receptacle,
aligning the conduit plug
first, then the gas plug.
Push until all fittings are
seated then tighten the
nut hand tight.
3.
Connect gas supply fitting and tighten with a wrench.
3A. Inlet - USA model
3B. Inlet - UK model
3C. Outlet
4.
Align Control Plug to
panel fitting and tighten
securely.
Installation and Operation