Assembly Instructions VERA RF600
39
4.19 Flown system setup with VERA20 loudspeakers
3. Remove the covers from the CaseRF600 transport case.
4. Insert the hook of your chain hoist into the shackle of the VERA LA900 load adapter,
which is mounted on the VERA RF600 rigging frame. The pin points suitable for your
application have been previously selected.
5. Actuate the chain hoist and raise the VERA RF600 rigging frame carefully from the
CaseRF600 transport case.
WARNING
Figure 4.19.1 – VERA RF600 rigging frame
2. Use the EASE Focus software to determine the number of VERA20 loudspeakers
suitable for your application.
NOTE
To set up the VERA20 loudspeaker system, proceed as follows:
1. Please note that setting up the VERA RF600 rigging frame always requires two persons!
WARNING
6. Loosen the two quick-lock pins at the front of the VERA RF600 rigging frame.
7. Both splay links in the front rigging rails must be extended downwards.
NOTE