951.20
.0
2.0
0
Stan
d 01
/20
19
- 18
-
6
In
it
ia
l
st
ar
t-
up
Compl
ete ins
tal
latio
n of
all
hydraul
ic
and el
ectric
al compone
nts
is
a p
reco
ndit
ion
for
commissi
onin
g.
6.1
Leak testing
and fill
ing the sy
ste
m
Che
ck al
l sy
stem
co
mpo
nents,
incl
uding
al
l p
re
-fa
bricated
el
em
ents
an
d st
ations,
to
en
sure
the
y are
lea
k-t
ig
ht;
seal
any
de
tected
lea
ks acco
rdi
ngly
. W
hen
do
ing
so
, a
dapt
the
test
pressure an
d tes
t du
ratio
n to
m
atch
the
resp
ecti
ve pi
ping
sy
stem
an
d the
resp
ective
operat
in
g p
ressu
re.
Onl
y f
ill
the
he
ati
ng sy
ste
m (
HW
) w
ith
filt
ered,
possi
bly
tr
eated
w
ater as pe
r V
DI
2035
an
d
completel
y bl
eed t
he sy
stem
.
6.2
Ventilating the
tubra
®
-eThe
rm T
Serv
ice posi
tion
Fill
the
sy
stem
w
ith w
ater.
Ope
n t
he m
anua
l v
ent
to
do so.
Tur
n the
sup
ply
ba
ll
val
ve to
45
° po
siti
on.
Let
the
ci
rcul
ation pu
mp
run
for
1
minu
te
at 10
0%.
To
do t
his,
se
t t
he m
ini
mum
the
rm
ostat
to
20
°C to s
ta
rt
the
pu
mp i
f t
he he
ati
ng e
lement
s are
col
d.
Tur
n the
sup
ply
ba
ll
val
ve back
to
op
erati
ng po
siti
on.
Aft
er t
he pu
mp s
top
s,
th
e re
mai
ning
ai
r i
s r
elea
sed
fro
m t
he m
anua
l ai
r v
ent
(9)
abov
e the
he
ati
ng
element
.
Summary of Contents for tubra eTherm T
Page 1: ...tubra eTherm T Montage und Bedienungsanleitung...
Page 13: ...951 20 02 00 Stand 01 2019 13...
Page 15: ...951 20 02 00 Stand 01 2019 15...
Page 17: ...951 20 02 00 Stand 01 2019 17 PV Heater...
Page 23: ...951 20 02 00 Stand 01 2019 23...
Page 26: ...951 20 02 00 Stand 01 2019 23...
Page 32: ...951 20 02 00 Stand 01 2019 17 PV Heater...
Page 34: ...951 20 02 00 Stand 01 2019 15...
Page 36: ...951 20 02 00 Stand 01 2019 13...
Page 48: ...tubra eTherm T Assembly and operating instructions...