13
TP9KACX / TP9KSCX
Jan 2017
STEP 10: (Electrical Connection to POWER UNIT & OVERHEAD LIMIT SWITCH)
1. Have a certified electrician make the electrical connection to the power unit. Use a separate circuit for
each power unit, as shown below in (Fig. 14).
Fig. 14
IMPORTANT! The wiring must comply with local code. Protect each circuit with time delay fuse or
circuit breaker. For 208V-230V single phase, use 20 amp fuse.
WARNING!! Never operate the motor in line voltage less than 208VAC as motor damage may occur.
2.
Have a certified electrician make the electrical connection for the K2 overhead limit switch to power
unit’s switch box, as shown in (Fig. 14b).
Fig. 14b
3.
Route limit switch cable thru Overhead Beam & Main Column, as shown below in (Figs. 15-17).
Fig. 15 Fig. 16 Fig. 17
Summary of Contents for TP9KACX
Page 4: ...4 TP9KACX TP9KSCX Jan 2017 ...
Page 6: ...6 TP9KACX TP9KSCX Jan 2017 Fig 2a TP9KACX Asymmetric Lift Fig 2b TP9KSCX Symmetric Lift ...
Page 21: ...21 TP9KACX TP9KSCX Jan 2017 EXPLODED VIEW 1 ...
Page 22: ...22 TP9KACX TP9KSCX Jan 2017 EXPLODED VIEW 2 ...
Page 26: ...26 TP9KACX TP9KSCX Jan 2017 ...