10
TP9KF
July 2015-A
Cable Route Diagram
Fig. 13
5. Repeat above for the second cable.
6. Adjust each equalizer cable to approximately 1/2” side-to-side play. Ensure that each cable has equal
tension. Also, check the carriage height to ensure both carriages are sitting on the same latch.
STEP 8: (Connecting the Hydraulic Hoses)
As shown on Figs. 12 & 14-16, connect the
hydraulic hoses.
When routing the hydraulic hose, make sure
that the hose is clear of any moving parts. It
is necessary to route hose through the
retaining rings or tie hose clear by using
nylon tie straps or wire.
Fig. 14 Fig. 15