18
STEP 7
(Routing Air Lines)
Connect the Air Safety Cylinders to the Air Safety Valve using the Tee Fitting and the Airline. Route the air line as
shown below making sure to position the push button air valve with the INLET facing towards the AIR SOURCE and
the OUTLET facing towards the lift. A filter/regulator/lubricator must be installed on air supply at lift. Failure to do so will
void the warranty. Cut the provided 1/4” air line tubing with a sharp blade to lengths as required. Tubing must be cut
square with no burrs.
Note: To assemble air line tubing into fitting, use firm, manual pressure to push tubing into the fitting until it bottoms out.
To remove air line tubing from the fitting, hold push sleeve in (against fitting) and, at the same time, pull out on tubing.
Pay careful attention to keep air line clear of any pinch points. Improper assembly may result in safety lock failure.
Note: An air supply (minimum: 30 psi / 3 CFM) is required for the safety-lock mechanisms to disengage. It is solely the
responsibility of the end-user to provide, install and maintain the air supply.
AIR PRESSURE SHOULD BE REGULATED TO 125 PSI MAX.
(See Fig. 7.1)
Summary of Contents for PL6K
Page 1: ...PL6K 6600 POUND CAPACITY LOW RISE PIT Installation and Operation Manual REV A 062813 ...
Page 2: ......
Page 3: ......
Page 25: ...25 6600Lbs 3000Kg 3300Lbs 1500Kg 3300Lbs 1500Kg ...
Page 26: ...26 ...
Page 34: ...34 MAINTENANCE RECORDS ...
Page 35: ...35 ...