![Turnils FA 22 Installation Manual Download Page 6](http://html1.mh-extra.com/html/turnils/fa-22/fa-22_installation-manual_1182167006.webp)
INSTALLATION - OPERATION - CLEANING — FA SERIES
FOLDING ARM AWNING
6
Place the awning in the brackets with the supporting profiles. Lock the supporting profile using the
bracket screw.
If face-fixed to masonry, there must be at least seven courses of bricks above the mounting position.
The spreader plate is used with support tube awnings to spread the load over three courses of bricks. A minimum of
four bricks below the spreader plate is recommended.
© Nordic Light 1-2015
3
Terrace awning
Nordic Light
FA20
Installation - Operation - Cleaning
Roof bracket 5-45°
Combi bracket
Wall brackets
Place the awning in the brackets
with the supporting profiles. Lock
the supporting profile using the
bracket screw.
b
Universal Bracket
Wall Brackets
Roof Brackets 5-45º
Spreader Plate
INSTALLING THE AWNING
Place the awning in front of the installation site and measure out the height for the external brackets.
These must sit as close to the arm's attachment on the supporting tube as
possible. Mark out and drill the holes for these brackets (NOTE! the wave line).
Mount the brackets using the requisite plugs and screws.
Stretch a piece of string between the outer brackets, mark and drill the holes
for the other brackets.
Keep in mind to place the brackets at the correct height so that the awning
has a ground clearance at the front edge of 2.0 - 2.2 metres.
© Nordic Light 1-2015
2
Terrace awning
Nordic Light
FA20
Installation - Operation - Cleaning
• Ensure that the awning is fixed to a sufficiently secure base.
• Warning for decayed wood, plaster that has crumbled away or brick and thin panel material.
• Check that windows can be opened after mounting the awning.
• The motor and any control equipment must be installed by an authorised electrician.
1
Installing the awning
Place the awning in front of the
installation site and measure out
the height for the external brackets.
These must sit as close to the arm's
attachment on the supporting tube
as possible. Mark out and drill the
holes for these brackets (NOTE! the
wave line). Mount the brackets
using the requisite plugs and screws.
Stretch a piece of string between
the outer brackets, mark and drill
the holes for the other brackets.
Keep in mind to place the brackets
at the correct height so that the
awning has a ground clearance at
the front edge of 2.0 - 2.2 metres.
a