
D301087 1211 - BL20 CANopen
2-3
BL20 Components
2.2
BL20 Components
For a detailed explanation of the individual BL20 components, please refer to chapter 2 and chapter 4.
The "Appendix" to this manual contains (amongst others) a list of all BL20 components and the
assignment of electronics modules to base modules.
2.2.1
Gateways
The gateway connects the fieldbus to the I/O modules. It is responsible for handling the entire process
data and generates diagnostic information for the higher-level master and the software tool
I/Oassistant.
Gateways with integrated power supply
The BL20 gateway BL20-GWBR-CANOPEN offers an integrated power supply unit for feeding the
gateway and the connected I/O modules.
It is not necessary to supply each individual module with a separate voltage
Gateways without power supply
2.2.2
Power Distribution Modules
Figure 2-1:
Gateway
BL20-GWBR-
CANOPEN
Note
The gateways without integrated power supply unit need an additional power supply
module (bus refreshing module) which feeds the gateway an the connected I/O modules.
Summary of Contents for BL20-GW-CANOPEN
Page 1: ...BL20 USER MANUAL FOR CANopen...
Page 4: ......
Page 8: ...D301087 1211 BL20 CANopen iv...
Page 14: ...About this Manual D301087 1211 BL20 CANopen 1 6...
Page 24: ...BL20 Philosophy D301087 1211 BL20 CANopen 2 10...
Page 54: ...BL20 Communication in CANopen D301087 1211 BL20 CANopen 5 2...
Page 68: ...Guidelines for Station Planning D301087 1211 BL20 CANopen 6 14...
Page 82: ...BL20 Approvals for Zone 2 Division 2 D301087 1211 BL20 CANopen 8 2...
Page 83: ...D301087 1211 BL20 CANopen 8 3...
Page 84: ...BL20 Approvals for Zone 2 Division 2 D301087 1211 BL20 CANopen 8 4...
Page 85: ...D301087 1211 BL20 CANopen 8 5...
Page 86: ...BL20 Approvals for Zone 2 Division 2 D301087 1211 BL20 CANopen 8 6...
Page 92: ...Glossary D301087 1211 BL20 CANopen 9 6...