background image

 

 

17 

 

7.  Filling the container

 

 

Using the tarpaulin covers 

 
The drill is equipped with tarpaulin covers that can be rolled open with cranks located at its front and rear 
edges, see Figs. 16–17. When filling the fertilizer container, you need only open the front part of the tarpaulin 
cover, and similarly, when filling the seed container, only open its back part. This will prevent mixing up the 
fertilizers and seeds  when  filling the containers.  During  transport and sowing,  the tarpaulin cover should 
preferably be kept closed and held in position with rubber mounts. This will avoid impurities penetrating the 
containers and securing the cover in position. 

 

 

Caution! On machines equipped with markers, the front edge crank must compulsorily 
be mounted whenever working with rubber holders, see Fig. 16. Otherwise, the crank can 
come into contact with a marker arm, leading to the risk of damage. 
 

   

Figure 16. Tarpaulin cover in work position. 

 

Figure 17. Tarpaulin cover in open position.

Use of sieves 
 

Standard sieving equipment is normally fitted to the fertilizer and seed containers of JC seed and fertilizer drills 
(this may vary by country and market). These  sieves prevent foreign  objects  from  causing feeding 
disturbances, or fertilizer crumbs etc. developing in the feeding equipment. The fertilizer sieve must always be 
kept in place during container filling and seeding. The seed sieve must also be in place except in the event of 
certain exceptions. 
 
Such exceptions include large or elongated seed shapes, which may be too large to fall through the sieve. For 
example, many types of oat cause problems, as the grains are long and light. 

If it is reasonable to suspect 

that the seeds will not be able to pass through the sieve, the sieves must be temporarily dismantled 
and removed from the container. When filling or seeding without sieves, special attention must be paid 
to ensure that no foreign objects enter the feeding equipment, i.e. remnants of sack, tools etc. 
 

Timing of the filling

 

 
When starting sowing, it is recommended that the machine be moved to the field in empty condition. Fertilizers 
and seeds are delivered to the field, i.e. with a trailer, and seed drill filling is carried out at the side of the field 
block. If the machine must be filled at a distance from the block to be sown, special caution must be exercised 
during transport with full containers. 
 

Caution! The maximum transport speed of 30 km/h may only be used on roads in good 
condition, and containers must be empty! The maximum permissible driving speed with 
full containers is 15 km/h! On potholed, rocky or extremely narrow roads, the transport 
speed must be adjusted downward according to circumstances. 

 

Monitoring of container levels is possible: 

Summary of Contents for JC 3000 Star XL

Page 1: ...NO 98856604 F 1 2019 TUME AGRI OY User manual JC 3000 Star XL JC 4000 Star Seed Drill Valid for serial numbers AH 53053 onward Read this manual before commissioning Translation...

Page 2: ...i Address Sudenkorventie 1 FI 14200 Turenki Hereby declares that Seed drills JC 3000 Star XL ja JC 4000 Star Serial number ___________________ are in compliance with the applicable decrees of the Mach...

Page 3: ...ing equipment and adjustments 20 10 Fertilizer feeding equipment and adjustments 22 11 Sowing table examples 25 12 Calibration test 26 13 Field test 30 14 Fertilizer application depth adjustment 30 15...

Page 4: ...t ensure that all covers are intact or installed in place before starting work When a reference is made in this manual to left and right sides this is when viewed from the rear of the machine looking...

Page 5: ...ould preferably be performed with empty containers Carrying loads on top of the machine is prohibited Do not drive over rocks or other obstacles so as to avoid tire damage Use caution when moving on t...

Page 6: ...pes The coulter s suspension is designed in such a way that ground unevenness will not significantly impact coulter weighting For shallow drilling especially on light grounds the coulter suspension mu...

Page 7: ...ded or transported When commissioning the machine remove the flat bar and re install it so that the pins protrude through the elongated slots The running gear can then be adjusted to the unevenness of...

Page 8: ...machine which can be used either as an ordinary bottom mounted side shaft such as with the Tume CultiPack cultivator A tow triangle is not provided with the multi function shaft Upper support for the...

Page 9: ...e the hydraulic line layout is completed these should be fixed in position by bending the line supports so that the lines remain in place Adjust the push bar working dimension so that the machine is h...

Page 10: ...stallation Figure 7 Standard tow bar and turnbuckle Figure 8 Standard tow bar and tow bar cylinder upper hole upper hole for use with wheel packer for use with wheel packer for use with tractor for us...

Page 11: ...11 Figure 7 Multi function shaft assembly drawbar cylinder mechanical push bar...

Page 12: ...ment may then become trapped under a tilting machine Note that there are no restrictors on the helical bars of the push bar preventing adjustment beyond the permissible range The portion of exposed th...

Page 13: ...ok or agricultural towing device with the bar installed as a lower tow bar see Fig 10 11 or also to higher mounted tow points A bar set as an upper tow bar is depicted in Figures 10 and 11 The upper t...

Page 14: ...on outlet Similarly the hydraulic push bar of a multi function tow bar optional is dual function and therefore requires another 2 function outlet NOTE When connecting hydraulic connectors the tractor...

Page 15: ...ng Sowing is then performed back and forth driving in the direction of the longest side of the block Caution Try wherever possible not to sow the corners of the block in a circular motion and raise th...

Page 16: ...lly in moist weather Damp fertilizer can lead to feeding problems Optimal seeding results are achieved at driving speeds of 7 10 km h In rocky conditions the driving speed must be reduced to suit the...

Page 17: ...feeding equipment The fertilizer sieve must always be kept in place during container filling and seeding The seed sieve must also be in place except in the event of certain exceptions Such exceptions...

Page 18: ...ghten the support arm locking screws after making the adjustment The partition adjustment area can be changed by moving the support arm ends to other attachments pins Fig 18 When using the machine for...

Page 19: ...back and forth fast with the adjustment lever until the last fertilizer grains fall out through the coulters Pull the cover out from underneath and install the seed side feeding equipment power transm...

Page 20: ...g direction The feeding equipment is manufactured of corrosion resistant materials The bottom flap adjustment lever under the feed rollers is in the center of the rear of the machine see Figs 20 and 2...

Page 21: ...y the actual feed amount will change between different seed batches In order to determine actual feed amounts and obtain an objective value you should always perform a calibration or field test see Se...

Page 22: ...d below past the scale 10 Fertilizer feeding equipment and adjustments Overview On the machine fertilizer feed chambers make up half the number of the seed feed chambers Feed amount adjustments are ma...

Page 23: ...23 Figure 25 Seeding table and usage examples...

Page 24: ...in this manual see Fig 25 provides a rated feeding adjustment position The hand wheel should always be adjusted so that the desired adjustment position is always approached from a greater adjustment...

Page 25: ...wing table is for reference only The actual sowing amount will depend on the characteristics of the seed used which will vary significantly based on year and type Sowing amounts must be checked with a...

Page 26: ...o where this intersects with the line with descriptor granular fertilizer Move vertically down from the intersection to the lowest scale where it can be seen that the main scale reading set on the adj...

Page 27: ...h the seed and fertilizer sides see Fig 30 You can retain both troughs in position during sowing However always remember to empty the troughs of dust etc before carrying out any calibration test The m...

Page 28: ...from the desired results because of ordinary variations in fertilizer and seed batches If the results obtained differ excessively from the desired feed results the feed amounts must be made more accu...

Page 29: ...g calibration tests and during actual sowing When returning the feed adjustment back to the value in practice or otherwise changing the feed amount always approach the desired adjustment value from th...

Page 30: ...with the sowing table above with the machine lowered to sowing position Weigh the seeds in the test sowing trough Multiply the weighing results by 100 to obtain the amount of seed in kg ha If tuning a...

Page 31: ...pplication depth is measured from the sowing track by digging up visible fertilizer grains During the measurement you can also define the seed sowing depth see Section 15 If the fertilizer application...

Page 32: ...ge layer must be observed The coulter spring load can be adjusted either coulter specifically or by using so called central adjustment Coulter loads against the ground can be adjusted between 2 and 20...

Page 33: ...by changing the position of the U holders on the square tube of the arm The harrow tines can be adjusted by changing the adjustment of the limiting screws see C Fig 33 Especially where large amounts...

Page 34: ...of a coulter tube and tip part The major seed coulter types include drag coulters and disc coulters In addition to the above the JC coulter range also includes a wing coulter All of these coulter typ...

Page 35: ...which can be sown with a single full container is known the meter can easily provide a indication for refill timings by adding the last fill area measurement to the measurement of the area to be sown...

Page 36: ...n off the tractor engine before staring maintenance and set the hand brake Ensure that no other person is able to turn the engine on during maintenance or actuate control equipment during maintenance...

Page 37: ...r of the support wheels must be lubricated annually with Vaseline JC 3000 8 nipples and JC 4000 10 nipples The wheel level and the harrow joints must be lubricated annually by pouring oil onto the joi...

Page 38: ...g device Spring and coulter parts can be replaced separately The torque of the mounting screws is 80 Nm Spring parts can be replaced by dismounting the spring from its fastener Fastener screws with a...

Page 39: ...mounting the scraper Once the angle is correct the disc distances from the top and bottom edges of the coulter tube must be equal This can be adjusted by turning the disc mounting screw For the durat...

Page 40: ...ound wheel These must be kept equally tight Stretched roller chains and worn tensioners must be replaced well in advance Pay attention to the accurate installation of the chain lock see Fig 42 Coulter...

Page 41: ...There are two blocks in the HKL 3000 JC and three in the HKL 4000 JC Each block has one or two wheel packages respectively see Fig 43 When replacing a tire the wheel package of the block in question...

Page 42: ...arried out by a tire professional who possesses adequate training experience and tools Installation without the necessary expertise may cause a risk of death The tire valve cap is fitted with a valve...

Page 43: ...orking width m 3 0 4 0 Container volumes l Total 3720 4160 Seed min 1350 1580 Seed max 3320 3640 Fertilizer max 2360 2580 Weight of basic machine kg Empty drag or wing coulter 2535 3100 Empty Laser mo...

Page 44: ...ment If new parts are needed for old equipment it is sensible to ensure the compatibility of the equipment by contacting the manufacturer s representatives Optional equipment and accessories Markers m...

Page 45: ...45 Figure 48 TC TC controller...

Page 46: ...LUBRICATION POINTS JC 3000 4000 100h 2pcs 100h 100 h 50h 4 pcs 50h 4pcs 200 h...

Page 47: ...100h 10 pcs JC4000 8 pcs JC3000 100h 5 pcs JC4000 3 pcs JC3000 100 h 100 h LUBRICATION POINTS JC 3000 4000 100h 2 pcs 50 h 100h 2 pcs...

Page 48: ...46 TUME AGRI OY PL 77 14200 TURENKI FINLAND TEL 0207 433 060 TEL int 358 207 433 060 www tumeagri fi...

Reviews: