SPT-6 SIX PACK TRAINER
7
Step 6 LAT CABLE ROUTING
STEP 3
E
F
G
STEP 4
I
G
H
8
51
79
86
81
64
49
59
21
85
59
49
4
8
51
79
86
81
64
49
59
21
85
59
49
4
STEP 5
M
L
K
J
I
STEP 2
E
B
A
D
C
59
49
59
21
85
49
64
81
86
51
79
8
59
49
59
21
85
49
64
81
86
51
79
8
STARTING POINT
STEP 1
RUN CABLE THROUGH STARTING POINT INTO
TOP SWIVEL PULLEY BRACKET AS SHOWN AND
THEN ASSEMBLE IT TO THE UNIT.
FOLLOW LETTER SEQUENCE
TO ROUT THE CABLE.
Assembly List
Item #
Description
Qty.
4
DOUBLE FLOATING PULLEY BRACKET LT
1
5
DOUBLE FLOATING PULLEY BRACKET RT
1
8
LAT CABLE
1
21
TOP BEARING HOUSING
2
49
FLAT WASHER SAE B/O 3/8”
4
51
HARD PVC CABLE STOPPER 1 1/2 RD X 2
2
59
HEX HEAD CAP SCREW GR-5 B/O 3/8-16 X 3/4
4
64
NYLON D HANDLE
2
79
SHOULDER BOLT ALLOY 3/8 X 3/4
2
81
SNAP LINK Z/P 8MM X 80MM
2
85
SPLIT LOCK WASHER B/O 3/8”
4
86
STRAP BRACKET 20 #SF20 STAINLESS STEEL
2