Eco Sweeping Machine
15
Mounting before initial attachment
Before the initial attachment can take place, indivi-
dual parts, if present, must be installed at the Eco
sweeping machine and checked for firm attach
-
ment.
Individual parts are only present if sever-
al sweeping machines are stacked on top of
each other on delivery.
Please request the respective installation
manual from Tuchel Maschinenbau GmbH.
Please specify the type label, serial num-
ber, and the year of construction of the Eco
sweeping machine in your request.
..1 -point linkage rear attachment
The safety instructions in Chapter 3.3 are
mandatory!
Check the receptacle for soiling. Clean
if necessary.
• Drive the carrier vehicle towards the sweeping machine.
• Select the bolt diameter (1) according to the attachment
category, hook and lock the draft link hook rods.
• Use upper hook bolts (2) according to the attachment
category and lock with upper hook.
Adjust the upper hook so that the attachment
receptacle is perpendicular to the ground.
(See also operating manual of the carrier ve-
hicle)
Verify the correct seating of the attachment
receptacle.
• unscrew clamping T-bolt (3) and shift the support (4) up-
wards and secure it again, if it exists.
• Connect the hydraulic lines according to the instructions
of the vehicle manufacturer.
• Lift the sweeping machine and carry out a functionality
check.
The Eco sweeping machine with 3-point
linkage can also be attached at the front.
Conversion see next page!
NOTE
NOTE
NOTE
NOTE
ATTENTION