background image

 2 

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 
 

 

 

 

 

 

 
 

 

 

 

 

 

 

 
 

 

 

 

 

 

 
 

 

 

 

 

 

㸱㸬

TSBSC and TSB3CTC Identification 

When purchasing the SHCCK RELAY, be sure to verify the following points. 
(1)

Verify the model number and specifications on the name plate are the same as those of which you 
ordered. 

(2)  Verify that product was not damaged during shipping. 

 
 

 
 
 
 
 
 
 
 
 
 
 
 

㻌 㻌 㻌

       

ᴾ ᴾ

㻱㼤㼠㼑㼞㼚㼍㼘㻌㻯㼀㻌

䢢䢢

䣖䣕䣄䢢

䢢䢢䢢䢢

䢵䣅䣖䢢

䢢䢢䢢䢢

䣅䢢

䢢䢢䢢䢢

䢳䢲䢲䢢

㻿

㻿㻴㻻㻯㻷㻌㻾㻱㻸㻭㼅㻌

䠏㻼

㼔㼍㼟㼑㻌㻯㼀㻌㻌

㼀㻿㻮㻿㻯㻌㼟㼑㼞㼕㼑㼟㻌

㻾㼍㼠㼑㼐㻌㻼㼞㼕㼙㼍㼞㼥㻌㻯㼡㼞㼞㼑㼚㼠㻌

㻝㻜㻜㻦㻝㻜㻜㻭㻌
㻞㻜㻜㻦㻞㻜㻜㻭㻌
㻟㻜㻜㻦㻟㻜㻜㻭㻌㻌

㼘㼘㻙

㼕㼚

㻌㼠

 

㻭㼘㼘

㼕㼚

㼛㼚㼑㻌㼠

㼜㼑

㼘㼘㻙

㼕㼚

㻌㼠

 

䠩䠽䡅䡊㻌

䠱䡊䡅䡐㻌

䣖䣕䣄䢢

䢢䢢䢢

䣕䣅䢢

䢢䢢䢢

䣄䢢

䢢䢢䢢

䢢䢲䢸䢢

㻿㻴㻻㻯㻷㻌㻾㻱㻸㻭㼅㻌

㻿㻯㻌

㼟㼑㼞㼕㼑㼟㻌

㻸㼛㼍㼐㻌㼏㼡㼞㼞㼑㼚㼠㻌

㻜㻢㻦㻢㻭㻌 㻌
㻟㻠㻦㻟㻠㻭㻌 㻌
㻢㻜㻦㻢㻜㻭㻌

㻭㼘㼘㻙

㼕㼚㻙

㼛㼚㼑㻌

㼠㼥㼜㼑㻌

䠟䠽䠾䡈䡁㻌

䣖䣕䣄䢢䢢䢢䢢䢢䢢䢢䣕䣅䢢䢢䢢䢢䢢䢢䢢䣅䢢䢢䢢䢢䢢䢢䢢䢢䢲䢷䢢䢢

㻿㻴㻻㻯㻷㻌㻾㻱㻸㻭㼅㻌㻌

㻿㻯㻌㻌㼟㼑㼞㼕㼑㼟㻌㻌

㻯㼍㼎㼘㼑㻌㻌

㻜㻡㻦㻜㻚㻡㼙㻌㻌
㻝㻜㻦㻝㻚㻜㼙㻌
㻝㻡㻦㻝㻚㻡㼙㻌
㻞㻜㻦㻞㼙㻌
㻟㻜㻦㻟㼙㻌

䠬䠽䡊䡁䡈㻌

䠱䡊䡅䡐㻌

䣖䣕䣄䢢䢢䢢䢢䢢䢢䣕䣅䢢䢢䢢䢢䢢䢢䣆䢢䢢

㻿㻴㻻㻯㻷㻌㻾㻱㻸㻭㼅㻌㻌

㻿㻯㻌㻌㼟㼑㼞㼕㼑㼟㻌㻌

㻼㼍㼚㼑㼘㻌㼁㼚㼕㼠㻌㻌

䣖䣕䣄䢢䢢䢢䢢䢢䢢䣕䣅䢢䢢䢢䢢䢢䢢䣕䢢䢢䢢䢢䢢䢢䢢䢲䢸䢢䢢

㻿㻴㻻㻯㻷㻌㻾㻱㻸㻭㼅㻌㻌

㻿㻯㻌㻌㼟㼑㼞㼕㼕㼑㼟㻌


㻸 㼛 㼍 㼐 㻌 㼏 㼡 㼞 㼞 㼑 㼚 㼠 㻌㻌

㻜 㻢 㻦 㻢 㻭 㻌
㻟 㻠 㻦 㻟 㻠 㻭

㻢 㻜 㻦 㻢 㻜 㻭 㻌

㻼㼍㼚㼑㼘㻌 㼠㼥㼜㼑㻌㻌

Ჽ᲻᳏᳎᳃᳉᳈

 

 

ڦ

If danger is expected from your application, take the necessary 

steps to ensure that it operates safely. 

ڦ

If your Tsubaki product does not operate normally, take care to 

ensure that dangerous operating conditions do not occur. 

ڦ

Wear suitable clothing and protective equipment (safety glasses, 

gloves, safety shoes, etc.) 

ڦ 

Keep your work place tidy and safe to prevent accidents.

 

᳑᲻᳌᳈᳃᳈᳁

 

9. Disconnect power. Always lock out power switch before installing,   

removing, or servicing unit. Comply with Occupational Safety and 

Health Standards 1910. 147 

The Control of Hazardous Energy 

(Lock Out/Tag Out)

.”

 

10. 

Install in proper enclosure in accordance with NEMA 

250-1991 

Enclosures for Electrical Equipment (1000Volts 

Maximum)

 and NFPA496 1993 edition 

Purged and Pressurized 

Enclosures for Electrical Equipment, 1993 Edition

.”

  When 

revisions of these standards are published, the updated edition 

shall apply. 

Guards must be provided on all power transmission and conveyor 

applications in accordance with provisions of ASME B15.1-1996 

Safety Standards for Conveyors and Related Equipment, or other 

applicable standards.    When revision of these standards are 

published, the updated edition shall apply. 

㻌 㻺㼛㼠㼑㻕㻌㻵㼚㻌㼞㼑㼓㼍㼞㼐㻌㼠㼛㻌㻼㼍㼚㼑㼘㻌㼠㼥㼜㼑㻘㻌㻹㼍㼕㼚㻌㼡㼚㼕㼠㻛㻼㼍㼚㼑㼘㻌㼡㼚㼕㼠㻛㻯㼍㼎㼘㼑㻌㼍㼞㼑㻌㼡㼟㼑㼐㻌㼠㼛㼓㼑㼠㼔㼑㼞㻌㼍㼟㻌㼍㻌㼟㼑㼠㻚㻌

Summary of Contents for SHOCK RELAY TSBSC Series

Page 1: ...RELAY to the end user 3 Product specifications are subject to change for improvement without notice 4 Disconnect power Always lock out power switch before installing removing or servicing unit Comply...

Page 2: ...e to prevent accidents 9 Disconnect power Always lock out power switch before installing removing or servicing unit Comply with Occupational Safety and Health Standards 1910 147 The Control of Hazardo...

Page 3: ...in one type TSBSCB06 TSBSCB34 TSBSCB60 Panel type TSBSCS06 TSBSCS34 TSBSCS60 Panel Unit TSBSCD Cable SBSCC05 TSBSCC10 TSBSCC15 External CT TSB3CTC100 TSB3CTC200 TSBSCC20 TSBSCC30 TSB3CTC300 Dimension...

Page 4: ...4 Specifications...

Page 5: ...DIN Rail While pulling the hook of Shock Relay to the arrow direction install Shock Relay to 35mm DIN rail When removal pull the hook to the arrow direction with flathead screwdriver 6 3 Panel unit 1...

Page 6: ...6 8 Explanation of each part 8 1 Operation portion...

Page 7: ...7 9 Setting procedure...

Page 8: ...OQVQT M9 RRNKECDNG 5JQEM 4GNC QFGN 0Q M9 RRNKECDNG 5JQEM 4GNC QFGN 0Q 65 5 65 5 5 65 5 65 5 5 65 5 65 5 5 65 5 65 5 5 65 5 65 5 5 65 5 65 5 5 QFGN 0Q 65 6 65 6 65 6 NCUU TCFG 4CVGF RTKOCT EWTTGPV 4CVG...

Page 9: ...9 Parameter...

Page 10: ...10 X100 Current Max Current Max Im Current Min io balancerat...

Page 11: ...11...

Page 12: ...12...

Page 13: ...13 close close...

Page 14: ...14 Wiring diagram 3 Communication function Single phase motor CB Circuit breaker OCR Overcurrent relay F Fuse MC Magnetic contactor TR Transformer...

Page 15: ...lay After the start over load trip occurs Load of motor Over load Motor capacity is reexamined Inertia is too big Start time setup value is examined It is too short It is set up a little long Current...

Page 16: ...r 5 Any repair by engineers other than the Seller or those designated by the Seller 6 Operation in an inappropriate environment not specified in the manual 7 Force Majeure or forces beyond the Seller...

Reviews: