30
Chapter 2
pieces, four right-angle tubing connectors, and four straight tubing
connectors. Remember to construct the frame so that all Velcro
surfaces face in (toward the center of the structure).
Notice
: Make sure that all support pole cups in the aluminum frame tubing
pieces are facing downward.
Figure 14: Diagram of 3 ft x 3 ft frame
2
Unfold the 3 ft x 3 ft fabric hood.
Continue with steps 3 through 10, beginning on page 27.
Changing DIP Switch Settings
You can change flow units and other parameters by adjusting the settings of
the DIP switches located inside the battery compartment. To gain access to
the DIP switches, first turn off the A
CCU
B
ALANCE
Plus and lay down the
instrument with the electronic meter facing down.
Remove the battery compartment cover by pulling up on the two latches.
You will see the switches numbered 1 through 8 in the corner of the battery
compartment. You may wish to remove or tilt up the battery pack to allow
easier access to the switches as shown in Figure 15.
Summary of Contents for 8372
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ...ii 4 TROUBLESHOOTING 37 Appendixes A BACK PRESSURE 41 B SPECIFICATIONS 43 ...
Page 22: ......
Page 44: ......
Page 50: ......
Page 55: ...TSI Incorporated 500 Cardigan Road Shoreview MN 55126 U S A Web www tsi com ...