14
3.2 Loading the Ribbon
1.
Place paper core on the ribbon rewind spindle.
2.
Insert the left side first. Mount the ribbon rewind
paper core on the front hubs.
Please be noted that the bigger hub side with 4
ribs must be installed toward the right side of
ribbon mechanism.
3.
Install a ribbon on the ribbon supply spindle. Mount
the ribbon supply spindle on the rear hubs.
Please be noted that the bigger hub side with 4
ribs must be installed toward the right side of
ribbon mechanism.
Summary of Contents for TTP-244 Pro Series
Page 40: ...36 9 Revise History Date Content Editor ...
Page 41: ......