2
Fig. A Wiring Diagram
Note:
The connection plan shows the maximum terminal assignment for operation of all existing functions of the solar controller. The minimum
terminal assignment consists of the solar panel inputs ("+" and "-") and the connections of the main battery.
Always connect the fuses as close as possible to the batteries (cable protection!).
Summary of Contents for SDC12
Page 3: ...3 ...