7
Installation
INSTALLING FIXED TOTETILTER:
1. Place the ToteTilter on a level surface — leaving sufficient room for forklift travel.
Note
: Shims, grout, etc., can be used to level the ToteTilter.
2. The ToteTilter should be set into place using a forklift or other equipment-moving machine
3. Mounting holes may have been requested at the time of purchase or may be drilled by the
owner in the available space of the ToteTilter’s stationary base.
•
Care should be taken when drilling holes in the stationary base to avoid damaging
additional components.
•
The owner is responsible for determining the most appropriate fastener to be used
when mounting a ToteTilter.
•
At no point should holes be drilled or modifications made to the articulating frame of
the ToteTilter as it is a structural member. Altering the frame in any way can result in
personal injury or death.
•
It is not necessary to affix the ToteTilter to a permanent structure, assuming it is
operated properly.
4. Connect the plant-provided airline to the ¼” NPT connection on the regulator
(150 psig maximum inlet pressure).
Note
: The pressure regulator should be verified at the stated pressure for the specific unit.
This information can be found on the equipment tag.
WARNING
Operating the ToteTilter with pressure regulator in excess of 30 psi can
result in unsafe conditions.
Pneumatic connections should be made in accordance with local, state,
and federal codes and standards.
CAUTION
Care should be taken when loading and unloading the ToteTilter to
prevent the unit from sliding out.
CAUTION
WARNING
Never attempt to move the ToteTilter or ToteStand with a tote,
intermediate bulk container, or other container placed on top.