6
S
ection
2 — A
SSembly
& S
et
-U
p
Tools Required
•
Adjustable Wrench or Socket Set
•
Needle Nose Pliers
Handle Assembly
Refer to Figure 2-1 and proceed to your
applicable chute style.
All units except those equipped with E-Z
Chute™
1.
Cut cable ties securing chute control
rod or upper handle to the lower handle
(if applicable) and set aside the chute
control rod (if applicable).
2.
Loosen the top two nuts (a) securing the
upper and lower handle and remove the
two carriage screws (b) from the lower
handle and set aside as shown in Figure 2-2.
(a)
(a)
(b)
(b)
Figure 2-2
3.
On select units, loosen the top wing nuts (a)
securing the upper and lower handle and
remove the two carriage screws (b) from
the lower handle and set aside as shown in
Figure 2-3.
(a)
(a)
(b)
(b)
Figure 2-3
4.
Place shift lever in Forward-6 position
(if equipped).
5.
Observe lower rear area of equipment
to be sure both cables (if equipped) are
aligned and seated properly in roller
guides. See Figure 2-4.
Figure 2-4
NOTE:
On units with Overhead Chute Control
(with Flex Shaft), Four-Way Chute Control, and
Electric Chute Control cut cable ties securing
flex shaft to the lower handle and set the flex
shaft aside. Remove rubber bands securing
cables to carriage screws and cut cable tie
securing shift rod to lower handle. Refer to
Figure 2-1 to help identify your unit.
6.
Pivot handle upward and align the tab
in the lower area of the upper handle
with the hole in the lower handle on
units with handles shown in Figure 2-2
and Figure 2-3. See Figure 2-5. Follow
the instructions applicable to your
handle hardware set-up in Steps 7 and 8
to secure the upper and lower handles.
Remove and discard any rubber bands,
if present. They are for packaging
purposes only.
Figure 2-5
NOTE:
On select units with steel rod
speed selectors, you may need to lower
shift rod to the side slightly to manuever
handle panel over it when pivoting
handle upward.
7.
On units with the handle set-up shown
in Figure 2-2, attach the two carriage
screws (b) and nuts (a) removed in
Step 2. Finish securing the handle by
tightening the top two nuts (c) loosened
in Step 2. See Figure 2-6.
(c)
(c)
(b)
(b)
(a)
(a)
Figure 2-6
8.
On units with the handle set-up shown
in Figure 2-3, attach the two carriage
screws (b) and wing nuts (a) removed
in Step 3. Finish securing the handle by
tightening the top two wing nuts (c)
loosened in Step 3. See Figure 2-7.
(c)
(c)
(b)
(b)
(a)
(a)
Figure 2-7
STOP
STOP!
Continue to Chute
Assembly Options (page 8).
E-Z Chute
1.
Remove cable tie (if present) securing
upper handle to lower handle for
shipping purposes. Remove all
protective plastic wrapping from
handles.
NOTE:
Be careful NOT to remove the
two loosely fitted cable ties that will be
utilized later to secure cables.
Summary of Contents for Arctic Storm 300 SERIES
Page 27: ...Notes 27 5 ...
Page 28: ...28 Section 5 Notes ...