
BA 8010_3.0_EN (10/2016)
31 / 68
8
Working Table
The work pieces to be processed are put onto the working table. To
facilitate orientation, a horizontal and a vertical ruler are located on the
engraving table. The table is ferromagnetic for easier fixation of work
pieces.
9
Keypad
The Keypad contains multiple buttons and displays for controlling the
device.
See section 4.3 Keypad for further information.
10
Maintenance Panel
Has to be opened with a 10mm Allen key to maintain optics.
11
Cooling Fan
Air cooled laser tubes are equipped with cooling fans on the laser tube
or the laser tube cover.
12
Exhaust hose connector
13
Manufacturer's Label
Shows important data of the machine like serial number or
manufacturing date.
14
Laser Tube cover
All laser tubes are equipped with a cover.
15
Power Supply
Changes the main power to power types suitable for the mechanic and
electronic parts of the machine.
Summary of Contents for Speedy 100
Page 1: ...BA 8010_3 0_EN 10 2016 1 68 OPERATION MANUAL 8010 Trotec Speedy 100 R ...
Page 17: ...BA 8010_3 0_EN 10 2016 17 68 ...
Page 28: ...BA 8010_3 0_EN 10 2016 28 68 10 Maintenance panel ...
Page 30: ...BA 8010_3 0_EN 10 2016 30 68 Used to align material and measure it ...
Page 39: ...BA 8010_3 0_EN 10 2016 39 68 ...
Page 43: ...BA 8010_3 0_EN 10 2016 43 68 ...
Page 57: ...BA 8010_3 0_EN 10 2016 57 68 7 Replace the mirror and fix it again with the two Allen screws ...
Page 67: ...BA 8010_3 0_EN 10 2016 67 68 ...