4
、
Installation instructions
1
Run 2PCS M4*25 screws through the
front z-axis profile and lock the power
on the back of the profile.
Take out the material rack, lock
the boat nut with the screw knife,
and fix the material rack on the
upper beam.
Put the four holes on the base, and lock the four
holes on the base with four PM5*25 screws.
Take left and right reinforced plate, Install on the pr
inter as shown
3
4
Power
supply
Control box
Tighten the boat nuts with a
screwdriver
,
Fix the control box on
the aluminum of the base.
Pay attention: The control box must be fixed
on the beam, otherwise its easy to hit the
print head.
2
M4*25
Filament rack
left
right