4
I
NSTALLATION &
A
DJUSTMENT
SETTING UP THE X-BIKE
™
Indoor Performance Cycle
A. Remove the bike and components from the shipping carton
1.
With assistance, move the box to the desired location in a well-lit and well
- ventilated area. Ensure that the carton is standing upright and remove the strapping material.
Ensure that you allocate sufficient floor space for the safe operation of the X-Bike after it has
been assembled.
2.
Pull the cardboard edge along the top of the box and carefully remove and dispose of the staples.
Remove the boxes of contents enclosed with the frame.
3.
Open each box and ensure that you have the following parts necessary to assemble your X-
Bike™ Indoor Cycle:
•
X-Bike™ Indoor Cycle Frame x 1
•
X-Bars™ Handlebar System Head Unit x 1
•
Handlebar Assembly x 1
•
X-Bars to X-Bike Adaptor x 1
•
Seat x 1
•
Seat Post x 1
•
Leveller Feet x 4
•
Quick Release x 1
•
Base Leg Front x 1
•
Base Leg Rear x 1
•
Bolts, Nuts and Washers for legs x 4sets
•
Pedals x 1L & 1R
B.
Assembling the Bike
All references to the right or left side and to the front or back are made as if you were sitting on the exercise
bike ready for use. For example, the chain guard is on the right side of the bike and the flywheel is at the
front.
1.
With the help of an assistant, lift the bike frame out of the carton and remove all protective
packaging.
2.
Screw the 4 leveller feet into the front and rear legs.
Leveller Foot