t150z pumped thermostatic electric shower
Frequency of in-service testing
Table
Conditions for In-service test
next in-service test
First in-service test.
6 to 8 weeks after
commissioning.
If no significant change in water outlet temperature
(greater than ±1°C) between commissioning and first test.
12 months after
commissioning.
On going service testing.
Annually on the anniversary
date when the unit was
commissioned.
BEAB CARE requirements