Exe Inclusive Bar Mixer Shower
10
Fig.12
Mixer outlet
Flow regulator
Flow regulator
Water flow
Angled top
section
Top
Note:
the flow regulator
must
be fitted with the
angled top facing the outlet flow of water.
LEAK TESTING
IMPORTANT:
Flush out the pipework in
accordance with Water Regulations and
Bylaws.
Fit the hose to the outlet, without the shower
head fitted, and direct it towards the waste
outlet.
Open the water isolating valves to the shower
and check for leaks.
If any leaks are found, rectify them before
carrying out the commissioning procedure.
COMMISSIONING
Start the water flow by rotating the flow control
(left hand side) anti-clockwise.
Make sure that the hot and cold water supplies
are fully open and at (or near to) their design
temperature and pressures, and are within the
requirements as stated on
page 2.
Make sure the temperature control (right hand
side) is at the maximum temperature setting
WITHOUT
operating the maximum temperature
override button.
Allow the shower to run at this maximum
temperature setting until the water temperature
has stabilised.
Rotate the temperature control until your desired
maximum showering temperature is reached.
NOTE:
If your desired temperature is above
the maximum temperature stop limit,
please see ADJUSTING THE MAXIMUM
TEMPERATURE STOP SETTING
section.
A final temperature check
SHOULD
be made on-
site to guarantee user safety, and that the mixer
falls within recommended maximum mixed
water outlet temperatures - as stated in the
Recommend Outlet Temperatures
section.
FLOW REGULATION
A flow regulator is supplied for use with high-
pressure water systems. It may be fitted with
any of the systems listed to reduce flow rate and
assist economy.
Fit the flow regulator into the outlet fitting as
shown in
fig.12.