Exe Inclusive Bar Mixer Shower
7
INSTALLATION
PREPARING THE SHOWER
Check the contents to make sure all items are
present.
Before starting, make sure all of the openings on
the valve are carefully covered to stop ingress
of any debris etc. while routing the supply
pipework.
The shower is suitable for exposed installation onto
solid wall, a stud partition wall, dry lined wall or
fixing to a laminate cubicle or panel.
SITING OF THE SHOWER & ACCESSORIES
Refer to
fig.7
for correct siting of the shower.
The shower should be positioned as detailed,
with all controls within comfortable reach of the
user.
The accessories (shower head, riser rail and/or
fixed shower head) can be positioned above or
to either side of the shower.
The shower must be installed in a position that
allows for easy access for future maintenance and
commissioning.
*SUPPLY PIPEWORK
Complete the pipework to the shower area
having decided on the position of the shower
and direction of pipe entry, for example rising,
falling or rear entry.
The hot and cold water pipes should be securely
attached within the wall or panel to support the
valve and prevent movement after installation.
Pipe fitting depth should be checked in
conjunction with the information given in
fig.8
- a
MINIMUM
of
7mm of thread MUST be
available
once the variable fitting is secured
into the wall end fitting and the cover trim
has been fitted. This is to allow the mixer to
be fitted correctly. Inlet pipe centres should be
approximately 150mm apart.
*IMPORTANT!
BEFORE FIXING
the supply pipework within
the wall, refer to the
SUPPLY PIPEWORK
and
VARIABLE FITTINGS
sections.
See
figures 8, 9
and
10
to ensure
the
MINIMUM
of
7mm of thread is
available
once the cover trims are fitted.
THIS IS REQUIRED TO ALLOW THE
CORRECT FITTING OF THE MIXER VALVE.
Shower head can
be mounted
either side of the
mixer
Height of
shower head
to suit user’s
requirements
*Fig.7
*Diagrammatic view – not to scale.
For illustration purposes only.